Well Control in Drilling: Kicks, the BOP Stack, and the Threaded Valves in the String
Well control in drilling starts with the mud column. When it fails, the crew closes the BOP stack around the string, closes the bore with the valves threaded into it, and circulates the kick out through the choke with heavier mud.
Well control in drilling is everything that keeps formation fluid from flowing uncontrolled into the well while the hole is open. The first line is the weight of the drilling mud; the second is the blowout preventer stack, which closes around the drill string, together with the valves threaded into the string that close its bore. A kick, an influx of fluid, is shut in and then circulated out.
At a glance
| Primary well control | The hydrostatic pressure of the mud column, kept above the formation’s pore pressure and below the pressure that would fracture the rock |
| Secondary well control | The blowout preventer stack, its control system, the choke and kill lines, and the valves in the drill string, used when the mud alone no longer holds the well |
| A kick | An influx of formation fluid into the well, seen first as a gain in the mud pits or a rise in returns |
| The BOP stack | An annular preventer and a set of ram preventers on the wellhead, closed by stored hydraulic pressure from an accumulator |
| Killing the well | Circulating the influx out through a choke and replacing the mud with heavier kill mud, keeping bottom-hole pressure constant throughout |
| The threaded part | The top drive valves, safety valve, inside BOP, float sub and crossovers, all joined to the string by rotary-shouldered connections |
| Decision this page supports | Understanding how well control works on a rig, which parts of it are threaded, and why those parts pass through the contractor’s yard |

What well control means
Every rock layer a well passes through holds fluid at some pressure: water, oil or gas in the pores of the rock. While the well is drilled, that fluid has to stay where it is. If it enters the well, it is called a kick; if a kick is not controlled and the fluid reaches surface unchecked, it is a blowout. Well control is the equipment, procedures and training that prevent the first and stop it turning into the second.
The industry describes it in layers. Primary well control is the mud. Secondary well control is the blowout preventer equipment, used when the mud has failed and fluid has entered the well. Tertiary well control covers the measures used when the secondary layer cannot regain control: a relief well, a dynamic kill that pumps heavy mud fast enough for friction pressure to hold the well, a barite or cement plug, or, offshore, a capping stack. On a normal well, only the first layer is ever used in earnest, and the second is tested and ready on every section.
Well control does not stop when drilling stops. A completed, producing well is held by its own barrier envelopes, which are covered in well integrity and barriers. While the well is being drilled the hole is open and the string is moving, and the barriers are the mud and the BOP.
Primary well control: the weight of the mud
A column of fluid presses on the bottom of the hole in proportion to its density and its vertical height. In oilfield units, hydrostatic pressure (psi) = 0.052 × mud weight (ppg) × true vertical depth (ft); 10.0 ppg mud at 10,000 ft TVD gives 5,200 psi. Measured depth along a deviated hole does not count, only vertical height. The drilling fluid is weighted, with barite or other materials, so that this hydrostatic pressure is higher than the pore pressure of every open formation. That is primary well control, and it works without any equipment at all as long as two conditions hold: the mud is heavy enough, and the hole stays full.
Formation pressure is described against a normal gradient, the pressure of a column of formation water, about 0.433 psi/ft for fresh water and 0.465 psi/ft for typical saline water. Abnormally pressured zones sit above that gradient and are where most kicks come from; subnormal zones sit below it and are where mud is lost.
The mud cannot simply be made as heavy as possible. Above a certain pressure the rock itself fractures and the mud is lost into it, which lowers the column and can let a shallower zone kick. Every hole section is drilled inside a window between pore pressure and fracture pressure, and the casing points are chosen so that each window can be held with one mud weight. Cementing that casing in place, shoe track first, is covered in well cementing and float equipment.
How a kick starts, and how the crew sees it
Most kicks come from a short list of causes: mud weight lower than a formation’s pressure, often because a zone is more pressured than predicted; failing to keep the hole full while pulling pipe out; swabbing, where pulling pipe too fast draws fluid in behind it; surging, where running pipe too fast pushes the bottom-hole pressure up until a weak zone breaks down and takes mud; losses into a weak zone that drop the mud level; and gas cutting the mud as drilled gas expands near surface. While the pumps run, friction in the annulus adds pressure on top of the mud column, the equivalent circulating density; when the pumps stop that extra pressure goes, which is why a well that was stable while drilling can flow on a connection.
The crew watches for the signs continuously, because every barrel taken before shut-in raises the casing pressure the kill has to handle and brings the shoe closer to breaking down (SLB Energy Glossary: kick).
| Sign | Effect to consider | What the crew should use for a decision |
|---|---|---|
| Increase in flow rate out of the well with the same pump rate | Fluid is entering from below and pushing mud out | A positive kick sign: shut the well in |
| Gain in pit volume | The most direct measure of an influx’s size | A positive kick sign: shut the well in |
| Well flows with the pumps off | The mud column no longer holds the formation | Shut the well in |
| Drilling break: a sudden rise in penetration rate | May mean a more porous and possibly higher-pressure zone | Flow-check before drilling further |
| Falling pump pressure with rising pump strokes | Lighter fluid entering the annulus reduces the pressure needed to circulate | Flow-check and compare against the expected trend |
| Hole taking less mud than calculated on a trip | The pipe pulled was replaced by formation fluid, not mud | Stop the trip and flow-check; consider running back to bottom |

The blowout preventer stack
The blowout preventer stack, the BOP, sits on the wellhead directly under the drill floor on a land rig, jackup or platform. It is a set of large valves, stacked one above another, that can close the well around whatever is in it (SLB Energy Glossary: blowout preventer).
The annular preventer is at the top. It closes a doughnut-shaped rubber element around the pipe and seals on drill pipe, collars or casing, and on many designs, as an emergency measure at reduced pressure, on an empty bore. That makes it the first preventer closed in most shut-ins. Below it are ram preventers: steel blocks driven in from each side (SLB Energy Glossary: ram blowout preventer). Pipe rams seal around the pipe body of one size, and variable-bore rams around a range of sizes. Blind rams seal the bore when no pipe is in it. Shear rams cut the pipe, and blind-shear rams cut it and seal the bore in one stroke, the last resort when pipe is across the stack.
Between or below the rams, side outlets lead to the choke line and the kill line. The choke line takes returns from a shut-in well to the choke manifold; the kill line lets mud be pumped into the well below the closed preventers. On a surface stack the connection to the wellhead is a flanged or clamped joint that is bolted, not threaded; a subsea stack latches on with a hydraulic connector. The wellhead side is covered in the wellhead in oil and gas.
On floating rigs, drillships and semi-submersibles, the stack sits on the seabed instead, with a lower marine riser package above it, and is operated through control pods, with remote and automatic backup functions. The preventers do the same jobs, but every function goes through the pods, with deadman, autoshear and ROV backup in case the pods are lost. The rig’s systems as a whole are laid out in drilling rig components and types.
The control system: accumulator, choke manifold and kill line
A BOP has to close when the rig has lost power, so it is not closed by the rig’s pumps directly. The accumulator unit stores hydraulic fluid under pressure in nitrogen-charged bottles, commonly at 3,000 psi on surface systems, enough to close the stack’s functions and hold them closed. Control panels on the drill floor and at a remote station operate it.
The choke manifold is a set of valves and adjustable chokes on the choke line. During a kill, the choke operator opens or closes the choke to hold back-pressure on the annulus, which is what keeps the pressure at the bottom of the hole constant while the influx moves up and out. Downstream of the choke, a mud-gas separator strips gas out of the returns and vents it safely before the mud goes back to the pits. The kill line and kill pump give a second route into the well when pumping down the drill string is not possible. Equipment design is covered by API Specifications 16A, 16C and 16D; installation, maintenance and testing of the whole system by API Standard 53, which US offshore regulation incorporates (30 CFR 250.730).
Shutting in and killing the well
When a kick is detected, the well is shut in: the drill string is spaced out so that no tool joint sits across the preventer being closed or the shear rams, and the pumps are stopped. In a hard shut-in, the default on many rigs, the preventer closes against a choke line that is already shut. In a soft shut-in, the choke line valve is opened through an open choke, the preventer is closed, and the choke is closed straight after. The crew then reads three numbers once pressures stabilise: the shut-in drill pipe pressure (SIDPP), the shut-in casing pressure, and the pit gain.
The shut-in drill pipe pressure is the underbalance. Because the string is full of mud of known weight, formation pressure is SIDPP plus the hydrostatic pressure of that mud column; with a non-ported float valve in the string, the float is pumped open briefly before SIDPP can be read. From it the kill mud weight follows: kill mud weight (ppg) = original mud weight (ppg) + SIDPP (psi) ÷ (0.052 × TVD ft). Circulation starts at the initial circulating pressure, the slow-rate pressure plus SIDPP, and falls to the final circulating pressure, the slow-rate pressure scaled by kill mud weight over original mud weight, as kill mud reaches the bit. Throughout, the choke holds bottom-hole pressure constant.
In the driller’s method, the first circulation removes the influx with the original mud and a second circulation replaces it with kill mud. In the wait and weight method, the kill mud is mixed first and one circulation does both. A third, the concurrent method, raises the mud weight in steps while circulating. Where circulation is impossible, the volumetric method bleeds measured volumes of mud at the choke while the gas migrates, and lubricate-and-bleed takes over once the gas reaches surface. Bullheading pumps the influx straight back into the formation, used when the pipe is off bottom or out of the hole, or when the gas is too sour to bring to surface.
Drilling crews and supervisors are certified to the level their role requires, through bodies such as the International Well Control Forum (IWCF) or the IADC WellSharp programme, and crews practise pit drills and trip drills, timed from the alarm to a closed well. The stack is tested on a schedule set by the regulator and the operator. On the US outer continental shelf, for example, pressure tests are due at least every 14 days, with a low test at 250 to 350 psi and a high test to the rated working pressure, or the maximum anticipated surface pressure plus 500 psi where that is approved; annulars and pipe rams are function-tested every 7 days (30 CFR 250.737).

The string side: valves threaded into the drill string
Closing the BOP seals the annulus, the space around the pipe. It does nothing about the inside of the drill string, and a kick can come up the bore of the string just as easily. That path is closed by valves that are part of the string itself, and every one of them is joined to the string through a threaded rotary-shouldered connection, the same family of connections described in drill string components.
- Top drive IBOP valves. An upper, remotely operated valve and a lower, manual valve sit under the top drive, so the driller can close the string from the floor while it is connected.
- The full-opening safety valve. A ball valve kept open on the rig floor with its operating wrench beside it. If the well kicks during a trip, when the top drive is not connected, the crew stabs it into the open joint and closes it.
- The inside BOP. A one-way check valve, stabbed on above the safety valve, that lets the crew pump down the string or strip back into the hole while nothing flows up it (SLB Energy Glossary: inside blowout preventer).
- The float sub and float valve. A sub near the bit carrying a flapper or plunger valve that stops flow up the string from below.
- Crossover subs. Because a safety valve has one connection type and the string may have several, a set of crossovers is kept on the floor so the valve fits whatever joint is open.
These are short threaded tools. A float sub that was under-torqued can leak or back off and take away the barrier in the bore, and a safety valve that will not stab and make up quickly leaves the string open on a flowing joint. The bottom hole assembly itself is made up at the rotary table, with tongs or an iron roughneck (see bottom hole assembly design), but many contractors pre-assemble parts of it in the yard: the float sub to the bit sub, the safety valve with its crossover kit, and the valves’ own body connections after service. Where that is done, a Galip hydraulic breakout unit makes up these short tools to the connection’s specified torque and keeps the record that goes to the rig with them. Casing and tubing accessories, such as pup joints and the float joints of a shoe track, go on a hydraulic bucking unit.
When the bench is not part of the answer
A make-up bench handles only the threaded tools in the string. It has no part in the following:
- The BOP stack itself. A surface stack’s connections are flanged or clamped and bolted, and a subsea stack latches on hydraulically, so no make-up bench is involved; its integrity comes from the stack maker, the rig’s maintenance and its pressure tests.
- Testing the valves. Safety valves, inside BOPs and float valves are pressure- and function-tested by their maker or a qualified service shop when serviced, and on the rig together with the BOP tests. A bench makes up and records the threaded joint; it does not certify the valve’s seal.
- Small operators with no yard. A contractor that receives its subs ready-made from a rental company relies on that company’s make-up records, and the right step is to ask for them.
Frequently asked questions
What are the components of a BOP stack?
A drilling BOP stack has an annular preventer at the top and ram preventers below it: pipe or variable-bore rams, blind rams and shear or blind-shear rams. Side outlets lead to the choke and kill lines. An accumulator unit closes it, and a choke manifold controls the returns while the kick is circulated out.
What is the difference between an annular preventer and a ram preventer?
An annular preventer closes a rubber element around the pipe and seals on many shapes and sizes, so it is usually closed first. A ram preventer drives steel blocks in from each side: pipe rams seal on the pipe, blind rams on an empty bore, and shear rams cut the pipe. Rams are rated to the full stack pressure, can be locked closed and can hang off the string; annulars often carry a lower rating.
What is a kick in drilling?
A kick is an influx of formation fluid, such as gas, oil or water, into the well because the pressure in the well has fallen below the formation’s pressure. Common causes are mud that is too light, a hole not kept full on a trip, and swabbing. A kick that is not controlled can become a blowout.
What are the warning signs of a kick?
The main signs are more flow coming out of the well than is being pumped in, a gain in pit volume, the well flowing with the pumps off, a sudden increase in drilling rate, and falling pump pressure with rising pump strokes. On a trip, the hole taking less mud than calculated is the key warning.
What is the driller’s method for controlling a well?
The driller’s method kills a kick in two circulations. First, with the original mud, drill pipe pressure is held at the initial circulating pressure until the influx is out. Then kill mud is pumped with casing pressure held steady until it reaches the bit, and drill pipe pressure is held at the final circulating pressure until kill mud returns. The wait and weight method does both in one circulation.
What are the three types of well control?
Primary well control is the mud, whose hydrostatic pressure holds formation fluid back. Secondary is the blowout preventer and choke system, used to shut the well in and circulate a kick out once the mud has failed. Tertiary covers a well the BOP cannot hold: a relief well, dynamic kill, barite or cement plug, or capping stack.
What is an inside BOP in drilling?
An inside BOP is a one-way check valve that is screwed onto the drill string, normally above a full-opening safety valve, to stop fluid flowing up the bore of the string. It lets the crew pump down or strip pipe back into the hole while the well is shut in. It joins the string through a threaded connection.
What is the difference between a surface and a subsea BOP stack?
A surface stack sits on the wellhead under the drill floor of a land rig, jackup or platform and is operated directly from the rig. A subsea stack sits on the seabed under a floating rig, is connected by a riser, and is operated through control pods, with remote and automatic backup functions because it cannot be reached by hand.
Before drilling out the shoe: the well control checklist
- The mud weight for the section sits inside the window between pore pressure and fracture pressure, and the window is written in the program.
- Flow and pit-volume monitoring are calibrated, alarmed, and watched on every trip as well as while drilling.
- The trip tank is lined up on every trip, and the trip sheet compares the mud put in the hole with the steel pulled out, stand by stand.
- The BOP stack, choke manifold and kill line have passed their latest pressure test, with the date and pressures recorded.
- The accumulator has passed its closing-time and pressure check.
- Shut-in procedure, space-out position and who does what are posted on the floor, and the crew’s latest pit drill and trip drill times are logged.
- The full-opening safety valve is on the floor, open, with its wrench, and fits the string with the crossovers kept beside it.
- The inside BOP is on the floor and ready to stab above the safety valve.
- The float sub, crossovers and string valves were made up to their specified torque, and the make-up records came from the yard with the tools.
- A leak-off or formation integrity test after drilling out the shoe sets the maximum allowable annular surface pressure.
- The kill sheet is filled in for the current depth: slow circulating rate pressures, the maximum allowable annular surface pressure, string and annulus volumes, and strokes to the bit and to surface.
Expert Consultation
Need more information on optimizing your equipment performance? Our engineering team is available for technical consultations.
Request a Quote
Tell us about your requirements and our engineering team will prepare a detailed proposal with specifications, pricing, and delivery timeline.